Case Studies

A5 M1 Link Road Case Study
Ainsworth Civils were tasked with creating a new pylon base slab which required precision engineering to facilitate the exact fitting of the pylon to the slab.

RAbbey Wood Crossrail Case Study
Network Rail is building a new station and two miles of new track in the Abbey Wood area as part of the Crossrail programme, with Ainsworth Civils providing civil engineering works on this project.
A34 Milton Interchange Case Study
Ainsworth Civils delivering the overall bridge construction works at the Milton Interchange.


Dungeness Power Station Case Study
Ainsworth Civils were awarded the contract by Balfour Beatty to install a 300mm C50 reinforced concrete raft slab to include a 400 wide x 350mm up stand.



M4 Chieveley Case Study
Ainsworth Civils were awarded the contract by Jackson Civil Engineering to conduct bridge deck repairs at Chieveley on the M4 junction 13



Rockdale House Case Study
Ainsworth Civils were awarded the contract for supplying groundworks, drainage and hard landscaping on their Summerbank and Laurie House refurbishment and new build developments.